راهنما راه اندازی سریع VX2

Step 1: 10 Essential Points You Should Know!

  1. For starting/stopping the motor, never use the inverter’s input or output power to turn it on or off.
  2. If the ambient temperature exceeds 40°Cor if the installation altitude above sea level exceeds 1000mis
  3. The inverter power should be at least one range higher than the load.
  4. Install the inverter vertically and ensure proper heat ventilation.
  5. In any case, at least 10cmfree space around the device is required.
  6. Moisture, dust, and chemical/corrosive particles can damage the device. Take necessary precautions to
  7. prevent this.
  8. Fast-blow fuse ()fastwith a rating of , aRis the best protection for the inverter input.
  9. If the inverter input voltage fluctuations exceed % 3, using an input choke is necessary.
  10. If the motor cable length exceeds 50m, installing a choke at the inverter output is recommended..