Replacement of a VACON 90 kW drive with a Parto Sanat drive in the Keyvan Energy project at Bandar Imam, Pier 34
Project: Replacement of a VACON 90 kW drive with a Parto Sanat drive in the Keyvan Energy project at Bandar Imam, Pier 34
Project Contractor: Motor Control Technical Office
Project Manager: Mr. Engineer Manouchehr Abdoli
Centrifugal Pump / Electric Pump (depending on context)

Electric Motor Nameplate

Photo of the burned 90 kW VACON drive and photo of the terminals of the previous VACON drive

Wiring diagram of the 90 kW VX drive

Photo of the installed Parto Sanat VX 90 kW drive inside the control panel

Installation and Commissioning Report: In the previous drive installation, due to a distance of over 100 meters and the presence of noise in the control circuit, the induced voltage prevented frequency stabilization. Other companies had also attempted to install well-known drives but failed to stabilize the frequency. However, we successfully commissioned the VX drive with minimal cost by isolating the control circuit using a few relays, achieving full frequency stabilization and earning the client’s satisfaction.
With thanks to Mr. Engineer Manouchehr Abdoli, Project Manager at Motor Control Engineering Company.